13 October 2016
eProjecta participates with a promotional stand in the professional market of the “Fira Mediterrània 2016”.
12 October 2016
One more year at eProjecta we have the pleasure of being the engineering team in charge of the legalization and supervision of all RallyRACC Catalunya permits. We have been in charge of everything from obtaining municipal licenses, self-protection plans, legalization of facilities, to monitoring the structural safety of the assemblies.
9 August 2016
eProjecta designs and creates the dining room for the new headquarters of the Epson company located in Sant Cugat del Vallès. It is made up of an area where a menu based on the Mediterranean diet is offered in a catering format and a dining space with tables and chairs measuring more than 200 m².
30 July 2016
eProjecta participates for different clients in the design and legalization of various Food Truck vehicles. This type of vehicle is a new trend to bring quality food to the street through these nomadic vehicles.
28 July 2016
eProjecta signs the commission for the design, management and legalization of a 400 m² restaurant in the tourist area of Vilanova i la Geltrú.
2 July 2016
At eProjecta we also carry out small technical procedures, a necessary service to cover the day-to-day needs of our client. Thus, we carry out a multitude of procedures, such as health records, energy certificates, certificates, appraisals, trademark registrations, drawing up plans, etc.
4 June 2016
We verify and certify the functional and structural safety of different stands at Primavera Sound for companies such as Movistar, Ray-Ban and H&M.
18 May 2016
From eProjecta we have projected a heating system of high performance, using latest generation materials and a system of production of thermal fluid with the system of aerotermia Daikin.
18 May 2016
eProjecta signs contracts with different festivals in 2016 such as Sónar, Doctor Music Festival, 080, Cruïlles, etc. by the VICE company.
5 May 2016
We are doing two new projects for the company SUPPLAID. The first is the expansion of the 100% of the available facilities in the municipality of Vic. The second is the new location in an industrial building of the new delegation in the city of Puigcerdà.