15 November 2018
Work begins on the construction of an industrial warehouse for the manufacture of chemical products in the Pla del Mas de Sallent industrial estate. eProjecta is the engineering company in charge of carrying out the entire technical project and also the project management of the work.
Saber más
19 April 2018
The President Amat Roumens Foundation (FUPAR) is a non-profit social economy entity that was created to give continuity to the process of training and social and occupational inclusion to adults with functional diversity. From eProjecta we have legalized the low voltatge electrical installation of the special work center, the generator set of complementary supply to […]
Saber más
18 April 2018
The transport company of goods and storage of products Transports Peva, SL, has entrusted the equipment of eProjecta to carry out the legalization of a storage facility of gas oil of own use formed by a deposit and two gas-oil generators A, following Royal Decree 706/2017, of July 7, which approves the complementary technical instruction […]
Saber más
14 February 2018
The assembly of the main carp of the sixth International Circus Festival has already begun in the city of Girona 2018. From eProjecta we take charge of all the technical documentation to obtain the license for an event that will have 30.000 viewers.
Saber más
2 February 2018
For the third consecutive year, the organizing company of Valencia Market Fest signs a contract with eProjecta to be the technical company responsible for carrying out the event that will include different types of activities such as design product markets, clothing, “Healthy” products, children’s workshops, food trucks, among others, and all of them live music. […]
Saber más
2 August 2018
eProjecta has signed a contract with a school in Sabadell to carry out an extension of the electrical installation of air conditioning and he existing heating installation of the school’s old building.
Saber más
2 August 2018
Eprojecta has signed the contract to be the technical office in charge of carrying out all the necessary procedures to obtain the temporary license for the 21st Mediterranean Fair that will be held in Manresa.
Saber más
16 May 2018
eProjecta has signed a contract to be the technical office responsible for the design and control of execution of 3 detached single-family housing with community garage located in the town of Masnou.
Saber más
16 May 2018
eProjecta has been the chosen engineering to describe the installation and operation of the musical event that will take place on May 25th at the subsequent parking of the Palau Firal de Manresa in the occasion of the celebration of the 75th anniversary of the Polytechnic University of Catalonia of Manresa.
Saber más
28 November 2017
Eprojecta signs a contract with the mining company ICL IBERIA to carry out a project to adapt DHW (domestic hot water) for Suria offices.
Saber más
27 November 2017
Monumental Club is back, a proposal that brings together music, markets and gastronomy in Plaza de Braus in Barcelona celebrated on 25th and 26th November. From EProjecta we take care of all aspects of legalization, safety aspects and environmental impact.
Saber más
16 November 2017
EProjecta signs a contract with VOLVO company for the design, management and legalization of a local car dealership of 1,800 m2 in Manresa city.
Saber más
Gracias, hemos recibido tu comentario.