27 March 2025
This 2025 eProjecta starts the rehabilitation project of an industrial building to turn it into an indoor soccer training center. It is a turnkey project, where all the facets that involve the transformation of this warehouse in the town of Barberà del Vallès will be executed to turn it into a fully functional center of […]
27 March 2025
eProjecta, in line with the expansion of its objectives for 2025, has reached an agreement with the Catalana Occidente Group for the complete refurbishment of several premises spread throughout Spain for the creation of new offices for the group. In this project, eProjecta will be leading different teams in the construction management, execution of the […]
21 April 2022
For a great engineering company in the region, we have carried out a comprehensive rehabilitation of a single-family home between party walls in Artés. This includes the complete restoration of the façade, the repair of the roof, a new distribution and the installation of an efficient aerothermal system. […]
20 March 2022
For a large international company, we have carried out a RITE project with the aim of legalizing the replacement of a climate machine by several equivalent machines, in particular 12, which will provide thermal energy to the office area. These machines have a cooling power of 54.4 kW and a heat output of 56.4 kW. […]
18 February 2022
To complete the legalization of a 50 kW photovoltaic installation in San Juan de Vilatorrada, we have carried out the procedures established by current regulations: processing with the distributor, request for a connection point, initial inspection, registration of the installation with the Industrial Security of Catalonia and in the Register of self-consumption and, in addition, […]
18 January 2022
This last month of the year 2021 we have carried out a project to legalize the installation of a generator, which will be used as a supply of electrical installation works for a supermarket: the generator it contains, on the one hand, the engine and alternator that generate electricity from the fuel and, on the […]
15 December 2021
This year we have carried out a project to legalize the electrical installation of an air conditioning and ventilation installation in the Eixample Citizen Service Office. We have also informed the Industry Services of the Government of Catalonia. In the project all the corrective measures, security and supporting calculations are defined. This premises has an […]
29 November 2021
This November we completed the project of a fire extinguishing installation consisting of a combined system of BIEs and hydrants for the restaurant “La Finka 4.1” located at kilometer 4.1 of the Highway between Alella and Granollers. The fire protection system includes 4 BIEs of 25mm, main and secondary external tank, a double pumping equipment, […]
4 November 2021
This spring we completed the legalization of a 100 kW photovoltaic installation for the Embamat warehouse in Terrassa. To carry it out, we carry out the procedures provided for with current regulations: processing with the distributor, request for a connection point, initial inspection, registration of the installation in the Industrial Safety of Catalonia and in […]
29 October 2021
This year we have signed with Ingimec to do a big project that has just started. eProjecta, as an engineer, will carry out the entire works project, the design of the electrical installation, the offices, the warehouse area, among others.